Monday, January 7, 2013

2nd Floor Slab Poured

 Anchor strap bolted to 2nd floor framing and wrapped around vertical rebar.


 Another view of the anchor strapping after weather resistant barrier was applied to framing.


2nd floor concrete slab form filled half way and #5 rebar cage set in place with #4 rebar hooks tied to #4  bars in vertical grouted cells.